Infrastructure
Extension of Line 2 — Agios Dimitrios–Elliniko Section
Electrical and mechanical works for the Agios Dimitrios–Elliniko extension of Athens Metro Line 2.
Scope of work
Electrical works: installation, connection and testing
Traction power substation for train operation (rectifier substation) Power substation for all auxiliary loads of the station (auxiliary substation) Medium- and low-voltage panels for power distribution, lighting, low-current and communication systems UPS system: UPS panels, battery room and battery charger Grounding system Automation and control system: BACS and PLC equipment Telecommunications: cameras, loudspeakers, microphones and telephone devices Lighting system: lighting panels, switches and sockets Fire detection system: fire-fighting panel and equipment HVAC system Signalling equipment Access control and intrusion detection system Cable routes as per the design: trays, conduits, flexible conduits or ducts. The contractor supplied the equipment, trays and cables; we supplied the support materials — conduits, cable connection materials (end boxes, boxes, clamps, connectors) and marking materials
Mechanical works: installation
Expansion shaft fans (BSF) Motorised fire dampers (MFD) Silencers Rails and monorail for erecting electrical and mechanical equipment The contractor supplied the equipment; we supplied the support materials
Related projects

Skouries K102 Project
Prefabrication and installation of HDPE piping, erection of steel piping and electrical works, with stations and substations, for the Skouries K102 project.
View projectConstruction of Thessaloniki Metro Stations
Electrical and mechanical works in Thessaloniki Metro stations, from traction power substations to signalling and access control.