Infrastructure
Skouries K102 Project
Prefabrication and installation of HDPE piping, erection of steel piping and electrical works, with stations and substations, for the Skouries K102 project.
On the K102 project at Skouries, Halkidiki, SEMAC carried out the prefabrication and installation of HDPE piping, the erection of steel piping and a wide range of electrical works on behalf of Irem SpA, for the end client Hellas Gold S.A. The works ran from April 2025 to August 2026.
On the mechanical side, our team transported, positioned, aligned and installed mechanical equipment, prefabricated and erected carbon steel and HDPE piping, and installed valves, pipe supports, in-line components and expansion joints, following detailed erection procedures and inspections.
On the electrical side, it delivered low- and medium-voltage installations: routing and termination of power and control cables, cable trays and supports, installation of panels, stations and substations, earthing and equipotential bonding, and the testing and commissioning of the electrical installations — with strict adherence to safety and quality protocols.
Scope of work
Mechanical
Equipment installation Transport, unloading, positioning, alignment and installation of mechanical equipment Installation of structural supports, bolting, greasing and protective elements Surface treatment and protection of equipment, piping and steel structures Detailed erection procedures and inspections
Piping systems
Prefabrication and erection of carbon steel and HDPE piping Installation of valves, pipe supports, in-line elements and expansion joints
Electrical works
Low- and medium-voltage electrical systems Cable laying, routing and termination (power and control cables) Cable trays, conduits and support systems Installation and integration of electrical equipment, panels, stations and substations Grounding and bonding systems Testing, commissioning and inspection of the electrical installations
Photos and videos
5 photos
Related projects
Construction of Thessaloniki Metro Stations
Electrical and mechanical works in Thessaloniki Metro stations, from traction power substations to signalling and access control.
View projectExtension of Line 2 — Agios Dimitrios–Elliniko Section
Electrical and mechanical works for the Agios Dimitrios–Elliniko extension of Athens Metro Line 2.
View projectLet’s talk about your project
Contact our team in Sindos, Thessaloniki, by phone or email.