Skip to content

Oil & Gas

Trans Adriatic Pipeline (TAP)

Civil, mechanical and E&I works for BVS 9, BVS 10 and GCS 01, and the engineering and fabrication of launchers, receivers and hydrotest heads.

Request a proposal

The Trans Adriatic Pipeline brings natural gas from Azerbaijan to Europe — through Greece, Albania and the Adriatic Sea to Italy. It is the European section of the Southern Gas Corridor. Proposed in 2003, with construction starting in 2016, it has been in operation since 2020; in 2022 its capacity was 10 bcm per year.

Scope of work

  • Civil, mechanical, electrical and instrumentation works for BVS 9, BVS 10 and GCS 01
  • Engineering and fabrication of 3 launchers, 3 receivers and 22 hydrotest heads

Photos and videos

3 photos · 1 video

Let’s talk about your project

Contact our team in Sindos, Thessaloniki, by phone or email.