Oil & Gas
Trans Adriatic Pipeline (TAP)
Civil, mechanical and E&I works for BVS 9, BVS 10 and GCS 01, and the engineering and fabrication of launchers, receivers and hydrotest heads.
The Trans Adriatic Pipeline brings natural gas from Azerbaijan to Europe — through Greece, Albania and the Adriatic Sea to Italy. It is the European section of the Southern Gas Corridor. Proposed in 2003, with construction starting in 2016, it has been in operation since 2020; in 2022 its capacity was 10 bcm per year.
Scope of work
Civil, mechanical, electrical and instrumentation works for BVS 9, BVS 10 and GCS 01 Engineering and fabrication of 3 launchers, 3 receivers and 22 hydrotest heads
Photos and videos
3 photos · 1 video
Related projects
HELLENiQ PETROLEUM Thessaloniki Industrial Installations: Mechanical & Electrical Works
Multi-year framework agreements with HELLENiQ PETROLEUM for mechanical, electrical, instrumentation and fire-protection works at the Thessaloniki refinery.
View project
DESFA Kardia Metering Station (U-9430): Detailed Engineering, Procurement & Construction
EPC of the Kardia metering station (U-9430) for DESFA: accurate gas metering, system integration and reliable operation in the national transmission network.
View project
Altbach HKW3: Fabrication and Installation of Alloy Steel Piping and Supports
Prefabrication, installation and testing of high-pressure alloy steel piping systems and supports (P91, P92, P22) for the Altbach HKW3 power plant in Germany.
View projectLet’s talk about your project
Contact our team in Sindos, Thessaloniki, by phone or email.